HISD’s state-appointed board approved a $92.4 million contract on a neighborhood park weeks before it expects to hand power back to elected trustees.
On Thursday night, Houston ISD’s state-appointed Board of Managers voted 7–0 to approve a construction contract worth up to $92.4 million for the Southside Launchpad Career and Innovation Center in Sunnyside. The center will be built on the former Grimes Elementary site, including Grimes Park, which the city renovated in 2023 and then closed in September. Residents in the room booed, turned their backs on the board and walked out after the vote, the Houston Chronicle reported. The contract lets the district negotiate with Drymalla Construction Company, and the center is set to open by fall 2028.
The board made the vote while it was leaving
At the same meeting, Board President Ric Campo said the transition back to local control could begin as soon as mid-January 2027. Incoming Gov. Hinojosa has pledged to end state takeovers of school districts. Elected trustees, who still hold their seats but can’t vote, asked the managers to wait. “This isn’t your decision to make,” trustee Maria Benzonsaid. “Do you want a smooth, robust transition? Then let the elected board decide.” The board voted anyway.
This vote moved power from the people Houston will elect to the people the state appointed. Here’s how a lame-duck board makes that stick:
- The contract outlasts the board. Elected trustees inherit a signed obligation instead of an open question.
- The money skips the ballot. Houston voters rejected a $4.4 billion bond in 2024 that included career-center funding. This project is being financed separately, without going back to voters.
- The park closed first. Residents learned in August that the plans included Grimes Park. By the time they organized, the city had already closed it.
The park is the part residents can see
Career training has a strong case. The center would offer hands-on programs in health care, skilled trades, cybersecurity and manufacturing, the kind of path to a credential many Sunnyside students need. But a neighborhood that lost its park, and had no vote on the trade, has reason to doubt the center was planned with it in mind. It’s the same tension SSC flagged in Houston’s ICE policy fight: who local institutions answer to.
Expect the incoming elected board to review the contract, and expect the first fight to be over what canceling it would cost, not over whether the center is a good idea. If the obligation holds, Sunnyside gets a career center it never voted on. Either way, the vote will shape how much trust the elected board inherits on day one.
